Jump to content

B.N.L. /Fermi Move Day 1


41chevy

Recommended Posts

Magnetic Partical Accelerator 50 foot diameter, 14 tons , Liquid nitrogen cooled. Flex of more then 1/8 inch wipes out millions of $$

First part yesterday final 10 mile 6 hour move from Brookhaven National Lab to Smith Point Marina to be loaded on barge start at 11 pm to night.

Barge trip from here to Chicago will take 5 weeks



"OPERTUNITY IS MISSED BY MOST PEOPLE BECAUSE IT IS DRESSED IN OVERALLS AND LOOKS LIKE WORK"  Thomas Edison

 “Life’s journey is not to arrive at the grave safely, in a well preserved body, but rather to skid in sideways, totally worn out, shouting ‘Holy shit, what a ride!’

P.T.CHESHIRE

Link to comment
Share on other sites

Here a minute of the move this morning at 2:30 am. Ring cost 25 million bucks.

post-3242-0-06405400-1372087127_thumb.jp

post-3242-0-21833000-1372087117_thumb.jp

"OPERTUNITY IS MISSED BY MOST PEOPLE BECAUSE IT IS DRESSED IN OVERALLS AND LOOKS LIKE WORK"  Thomas Edison

 “Life’s journey is not to arrive at the grave safely, in a well preserved body, but rather to skid in sideways, totally worn out, shouting ‘Holy shit, what a ride!’

P.T.CHESHIRE

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...