Jump to content

One side nearly done

Keith S

Still need spring pins and too finish painting other springs. It took a few attempts to get the spring into position without scratching the hell out of everything.


From the album:

Electric Conversion

  • 47 images
  • 0 comments
  • 17 image comments

Photo Information for One side nearly done

Taken with OLYMPUS IMAGING CORP. u1010,S1010

  • 6.6 mm
  • 1/100
  • f f/3.5
  • ISO 80
View all photo EXIF information

Recommended Comments

The casting # of the hub with the three cracks that I welded is 8QJ8131P1. It's a poor casting - a lot of scabbing on the inside of the spokes. It also has a much bigger outer bearing (the inner is the same size as the other hub #8QJ414).

Share this comment


Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...